Common minimum standards
'Government Construction: Common Minimum Standards for procurement of the built environments in the public sector' is generally referred to as the Common Minimum Standards (CMS), although the Government Construction Strategy proposes that it should be renamed the Government Construction Standards.
The CMS can be downloaded in full from the Gov.uk website.
The CMS summarises existing government policy on construction. It states that central government construction projects (including departments, executive agencies and the non-departmental public bodies for which they are responsible) should be carried out '…with full reference to the CMS'. Where public projects have been devolved to the wider public sector, reasonable measures should be taken to ensure that the CMS are adopted.
The CMS is quite short at just 17 pages. It includes guidance on:
- General standards.
- Project and programme procurement.
- Health and safety.
- Design.
- Historic estate.
- Sustainability.
Before the CMS was published, the Office of Government Commerce (OGC) produced a great deal of guidance about best practice in procurement and project management. OGC has now been absorbed into the Cabinet Office, and OGC guidance has been archived, however, much of the guidance in the CMS mirrors the procedures set out in the OGC Gateway Review Process, and OGC guidance is referenced in the CMS.
Similarities between the OGC Gateway Review process and the CMS include:
- Requiring that projects undertake OGC Gateway Review risk profile assessments and the OGC Gateway Review process (or similar approved process).
- Requiring collaboration and the early appointment of an integrated supply team.
- Proposing that contract routes other than PPP (public private partnership) / PFI (private finance initiative), design & build, prime contracting and framework arrangements …should not be used unless it can be clearly shown that they offer best value for money.
- Proposing the use of the PAS 91 (Publicly Available Specification) standard pre-qualification questionnaire.
- Proposing the development of an output-based specification.
The CMS also includes references to:
- The principles set out in the Government Construction Strategy.
- Fair payment practices.
- The Green Book (the government framework for the appraisal and evaluation of policies, programmes and projects).
- A requirement to collect and analyse health & safety data.
- A requirement for contractors to be registered with a good neighbour scheme.
- A requirement to assess buildability, functionality, maintainability, sustainability and future flexibility when assessing designs.
- A requirement to comply with the Protocol for the Care of the Government Historic Estate.
- A requirement to follow the procedures set out in Achieving Excellence in Construction Procurement Guide 11: Sustainability.
- A requirement to take account of the Government Buying Standard for construction. This requires the adoption of an environmental assessment process. Where BREEAM (Building Research Establishment Environmental Assessment Method) is used, new projects should achieve an ‘excellent’ rating, and refurbishment projects with a value over £500k should achieve at least a ‘very good’ rating.
- A requirement to procure timber in accordance with the governement’s timber procurement policy.
- A requirement to fall within the upper quartile of energy performance for that building type.
- A requirement to take account of resilience to climate change.
The CMS is updated regularly and includes details of progress made in key areas.
[edit] Related articles on Designing Buildings
- Common standards.
- Government Construction Strategy.
- OGC.
- OGC Gateway Review process.
- Major Projects Authority.
- Public project: outline work plan.
- Public procurement.
- Setting the standard.
- The Green Book.
[edit] External references
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.